Keeping Transit Running in Edmonton’s 2027-2030 Budget
Every four years, Edmonton’s City Council allocates funding for the services and programs that keep the city running. This budget cycle, ETR is urging Council to give transit the consideration and funding allocation it deserves to maintain and grow the capacity, accessibility, and usability of the transit system.
The public hearing for the budget cycle is occurring on November 23 and 24. This is when riders have a chance to make their voices heard directly in front of City Council. Sign up to speak here, or see ETR’s helpful guide to the process here.
Our Priorities
ETR’s priorities are the same as they have always been – keep transit user-friendly, convenient, and accessible for all. Below is some background on the items that are being deliberated, and why they are critical in the upcoming budget cycle.
ETR supports targeted renewal of the bus fleet, advancing Bus Rapid Transit and the Windermere Transit Centre, funding transit priority, and keeping fares accessible. ETR does NOT support the fare gate trial project.
Fund targeted bus fleet renewal to the full $388 million
- Our advocacy page: https://edmontontransitriders.org/busfleet/
- Committee presentation on fleet renewal
- Proposed Capital Budget, page 537
- Response to Council Motions, page 3
Over half of Edmonton’s bus fleet over the age of 15, which is the average retirement age of North American buses) and 56.4% of the bus fleet in either ‘poor’ or ‘very poor’ condition as of 2025.
This $388M package will replace 300 conventional buses, 49 community buses and 19 DATS vehicles, as well as fund 288 midlife refurbishments by 2030. Currently only $186M of necessary funding has been recommended. This minimum funding would prevent service cuts this budget cycle, but would still see the average fleet age increase, and the over 400 buses that will have to be retired by 2034 will not be able to be replaced in time to avoid service cuts in the future.
Ensure renewal initiatives for maintenance are funded
Multiple capital budget profiles are recommended for funding regarding the renewal and maintenance of LRT and transit facilities. They should be funded to at least the recommended capacity. These profiles include:
- CM-66-3400 LRV Fleet & Equipment Renewal
- CM-61-3235 Transit Rail Track, Row And Component Renewal
- CM-13-0000 Facility: Service Support – Renewal
- CM-21-0000 LRT Facility – Renewal
- CM-61-3609 Bus Technology Renewal
- CM-66-3000 Transit Communications Renewal
- CM-66-3300 LRT Signals And Electrification Renewal
Prepare for the next phases of Bus Rapid Transit planning and implementation
- Our advocacy page: https://edmontontransitriders.org/build-brt/
- Proposed Capital Budget, page 180
- Response to Council Motions
Fast and efficient transit through our busiest corridors like Whyte Ave using Bus Rapid Transit helps move people and build resilient streetscapes. Dedicated right of way and transit signal priority make travel times as efficient as possible when correctly implemented.
Right now, there is no budget ask for Bus Rapid Transit. However, Administration’s current proposed budget preserves debt capacity which would ensure there are funds available in 2027, and this debt capacity must be maintained to ensure BRT is feasible.
Fully fund the Ride Transit program and maintain discounted fare tiers
- See Proposed Operating Budget, page 1108 for ETS Fares and Passes
Keeping transit affordable by ensuring the Ride Transit program and base senior and youth discounts are fully funded, easy to understand, and accessible is crucial to maintain affordability as costs increase.
With the proposed budget realigning Arc fares with the $3.75 cash fare (moving the 34-trip monthly cap from $102 to $127.50), Edmonton’s standard fare remains among the lowest of any Canadian city with rail transit. Daily fare caps are proposed to remain at $10.50, meaning that the daily cap will decrease from 3.5 trips to only 2.7.
Still, an extra $25.50 a month hits hard for households already stretched thin. As standard fares realign, City Council must focus on protecting Edmonton’s most vulnerable riders and ensuring everyone who qualifies for support can actually access it.
Here is what we are asking Council to commit to in the 2027–2030 budget:
- Preserve existing subsidy rates for the tiered Ride Transit Program, alongside base discounts for youth and seniors, so cost is never a barrier to getting around.
- Make it easier for eligible low-income Edmontonians to find, apply for, and receive a reduced-cost Arc card.
- Maintain the 3.5-trip daily and 34-trip monthly cap structure so frequent riders are rewarded.
- Commit that any further fare adjustments beyond this realignment will be matched with proportional bus and LRT improvements including Valley Line West and Capital Line South.
Leverage the Canada Public Transit Fund (CPTF) to build the Windermere Transit Centre
- Proposed Capital Budget, page 180
Because Edmonton cannot expand its overall bus fleet until the Southeast Transit Garage is completed in 2032, City Council has to make the most of the buses and drivers we already have.
Over the past decade, service hours have decreased per capita, as growth has outpaced the addition of service hours. Additionally, the fleet is at its maximum kilometres per year per bus, meaning further off peak service cannot be added. Even without adding more buses or service hours, there are ways to make the system more efficient.
Funding the Windermere Transit Centre eliminates overlapping local routes to Century Park and Leger, freeing up service hours that can be reallocated to boost frequency on routes like the 31.
Reject the fare gate trial proposal
- Response to Council Motions, page 5
Fare gates were recently rejected in 2024 by City Council. Now, Council is again considering an unfunded budget proposal to pilot physical fare gates at an LRT station. While it was approached by perceptions of safety in 2024 and for fare evasion prevention in the current proposal, ETS’s own analysis found that reduced fare evasion will not bring in enough revenue to cover the cost of installing and staffing fare gates. Reports prepared for both Edmonton and Calgary, looking at transit systems across North America, found no evidence that fare gates actually improve safety, and they do nothing to address isolated stairwells and underground corridors. They would block off pedestrian access when retrofitted into stations not built for them. Instead of spending millions of capital and operating dollars on fare gates, Council should fund solutions that ensures the fleet stays running.